Work Signals research guide

How opportunity evidence scores work

An evidence score helps you see how much supporting information is available for a planning opportunity.

The five contributing factors

  • Planning record: 30 points. The application supplies the starting evidence.
  • Recent planning activity: 25 points. Available for non-archived records with activity within the last 90 days.
  • Specific proposed work: 15 points. The proposal identifies a relevant work category. General proposed work and planning follow-up do not receive these points.
  • Matched sale evidence: 15 points. A recorded property sale has an exact normalised full-address and postcode match.
  • Matched energy evidence: 15 points. Linked domestic EPC evidence adds information about the property.

What does 85 out of 100 mean?

A planning record with recent activity, specific proposed work and matched sale evidence totals 85. Without a matched EPC it receives no energy-evidence points. You can inspect the components on the scorecard rather than relying on the number alone.

What the score does not tell you

It is not an 85% chance of winning work. It does not confirm a project budget, a start date, permission to contact someone, or that a contractor has not already been appointed. A lower-scoring record may still be useful if the proposed work fits your expertise.

Company identity and HMLR portfolio research add separate context without increasing the score. A similar company name does not establish a connection, and a portfolio match does not prove ownership of a planning site.

Use the score with the underlying sources

Sort results by evidence score, then read the description, source dates and status. If a council extract supplies a searched activity period instead of an exact validation date, the scorecard explains that limitation. Downloading old data never turns its collection timestamp into a new planning event.

Read about matching and source coverage · Explore Work Signals plans